Drilling

The maiden drill campaign at Nevada Rand began in January 2020. Between 6 and 8 core holes are planned totally approximately 1000 metres. Two sections of holes will test the south-east and north-west strike extensions of the Nevada Rand workings. The remaining drilling will test the Quartz Hill area, 550 metres north-west of the Nevada Rand shaft.